BAE to move heavy load via Bridge Road on Thursday at 9:15am



BAE Systems in Barrow is due to transport a heavy load by road on Thursday 12 July.

 
The load will be transported from the Top Yard to the Devonshire Dock Hall via Bridge Road at 9:15am.
 
Roadblocks will be in place on Bridge Road and Walney roundabout for approximately 20 minutes. There will be minor disruption to traffic during this time.
 

Photo Gallery

0 Comments Write your comment

    1. Loading...