BAE to move heavy load via Bridge Road on Fri 23rd Feb at 9.30am



BAE Systems in Barrow is due to transport a heavy load by road this week.

 
The load will be transported from the Top Yard to the Devonshire Dock Hall via Bridge Road on Friday 23 February at 9:30am.
 
The move will take approximately 30 minutes, causing minor disruption to traffic.
 

0 Comments Write your comment

    1. Loading...